From first order to final handover
— and every shift after.
Projects, materials, documents, completions and maintenance on one connected equipment record.

01 / HOW IT FITS TOGETHER
Two pathways. One equipment record.
Projects build it. Maintenance runs it. ANA-MS keeps every tag’s history in one place, so what was installed, tested and handed over is exactly what Operations inherit.
Projects & Completions
One equipment record
Maintenance & Operations
02 / PROJECTS & COMPLETIONS
Know exactly where every system stands.
Subsystems & gates
Gated completions from mechanical completion to handover. A gate only issues when its checksheets are signed and its punch is clear.
Punch lists
Category A, B and C punch raised against the right tag, with clear owners, so blockers show up before they hold up a gate.
Walkdowns
Capture punch on site against the right tag, so nothing gets lost between the walkdown and the punch list.
Handovers
Hand systems to Maintenance with the full record attached: signed checksheets, punch and documents, ready to accept.

The readiness critical path: which subsystems wait on which, how much work is left before each gate, and what is holding up the most.

Every subsystem and every gate, from mechanical completion to handover, at a glance.
03 / MAINTENANCE & OPERATIONS
One shared picture for the people running the plant.
Equipment history
Every defect, repair and change on a tag, alongside its build and commissioning record.
Operating status
See what is running, on standby, isolated or out of service, and which critical equipment is not available.
Defects
A closed defect loop: anyone can raise it, Maintenance fixes it, Operations confirms it back in service.

One shared picture of equipment status and defects for maintenance and operations.
04 / THE SHARED FOUNDATION
One set of records, used by both sides.
REGISTERS
Equipment register
One record per tag, from construction through operation.
Hazardous area register
Hazardous-area equipment recorded against each tag and zone, with Ex inspection status tracked.
Override register
Every override logged with an owner and a time limit, with overdue overrides flagged.
WORK
Tasks & Task Packs
Plan and allocate tasks, and print Task Packs for technicians in the field.
COMMERCIAL & DOCUMENTS
Purchase orders
Track POs and vendor deliverables against the equipment they supply.
Document control
Revision-controlled documents linked to tags, with site mark-ups tracked back to the master copy.
05 / BUILT FOR HOW SITES WORK
Vendor & subcontractor access
Their own logins, showing only their tasks.
Ask ANA
Ask questions of your project data in plain English.
Live dashboards
Progress, blockers and what is next, filtered your way.
06 / SECURITY BY DESIGN
Built for secure industrial work
Multi-factor authentication
Encryption in transit and at rest
Built around UK data protection
Your data stays yours. The client owns the data.